20.08.20
Første møte, brukte mesteparten av tiden på å bli kjent og brainstorme eventuelle ideer. Avtalte nytt møte mandag 24.08.20 for å finne gruppenavn og standfeste hvilke oppgave som var mest interessant.Vi avtalte også å møtes i forkant av neste forelesning, dette var for å ta en endelig avgjørelse om hvilke prosjekt vi ville velge, dette […]
-
Introduksjon
Gruppe: Gibbiceps De på gruppa er: Gustav Kallager – Elektro Fredrik Lium – Elektro Kasper Lundsbakken – Data Inge Moen – Maskin Alison Wartenberg – Data Det vi ønsker å lage er et smart aquarium. Dette vil innebære å lage et aquarie som kan regulere seg selv i henhold til verdier, mating og vasking. Aquariet […]
-
Haptix week 48
Petter For those with access, check out Haptix2/Haptix/Assets/Petter Scripts for most of my work this last week. This last week has been rough, I’ve gone from a rough prototype of a new Rubix script, which controls movement of the cube, to a relatively functional one who also works with leap motion and other members scripts. I’ve gone through an insane amount of […]
-
Group 7 Week 13-14
Final 2 weeks Mechanical: Adithya: The first week I printed out the necessary parts to assemble the body of the main body of the tank, including the side panels. This allowed to begin assembling the body of the final product as shown below. I am satisfied with how it looks as it resembles a tank […]
-
Group 02 – Project Report – Week 13
Mechanical This week we finally got a hold of two more 24V fans which serves our purpose of creating enough pressure under the board plate to make the disc “float” as we want it too. To see how this works in practice, watch the video below. I have also used a lot of time finishing up all the […]
-
Week 49 Group 6
Joel Soto Escoda (Electro) Marius Kul Balsvik (Machine) Kristoffer Andersen (Machine) Steffen Barskrind (Computer) Kristian Meinich Backer-Owe (Computer) Nils Herman Lien Håre (Computer) All of our code is on our Github page here https://github.com/steffenbk/Week-49-blog NB! we added the new code for the IR remote after the deadline because our main controller died and we had […]
-
Group 4: ASD – Sprint 14
Date: 21.11.2019 – 03.12.2019 (final sprint) GitHub: https://github.com/Bunogi/asd The final week was a race to the finish in order to complete as much of the drone as we could before the deadline. We had multiple bottlenecks last week and we are happy to announce that we have overcome the obstacles and achieved a lot this […]
-
Project Fetch Group 1 – Week 13 and 14 14.11 – 21.11, 22.11 – 03.12
Week 13 After our realisation that the Raspberry Pi only supports a single camera, we went ahead and got ahold of another Raspberry Pi and connected them with an ethernet cable. Setting up network between them and some ROS settings allowed the ROS on each of the Pi’s to communicate with each other. We have […]
-
Shallow Blue week 48
github link: The codes for the Project can be found in our Github that is linked under. https://github.com/Shallow-Blue/AutoChess Sondre Fuhre Orsten and Ole Henrik Eidal Flesaker: This final week we have been trying to clean up code, add features to make the game complete and implementing an UI. The features to make the game complete […]
-
Week 48 Group 6
Machine: The last few posts have been scarce on updates from the machine students. We have however been making good progress on the tank. By simple laying the gun on a flat surface we could tell the gun was not level. This would affect the accuracy. It also had limited points to which it could […]