Group 2: Card playing robot – Sprint 3
Sprint 3: 04.09.2020 -11.09.2020 During our weekly meeting we updated each other on the status of the different tasks from the scum board and challenges we faced during our last sprint. Using our scrum board, we structured the different tasks During the last sprint there were several concepts within our system that were still up […]
-
Arduino Cannon Blog Post – Sensors
David Dokka (Data) 09.09 The Arduino Cannon is in its early conception and we as a group are figuring out what is required to meet the primary demands of our project. The software requirements can be summed up something like this: 1. The cannon can orient around the X- and Y-axis 2. Can in some […]
-
First sprint – Puck Buddies
Short about us and our project: Our group: We are a group consisting of two machine engineering students and two computer science engineering students currently working on our fifth semester at Krona which is a campus belonging to the University of South-East Norway. Our team consists of: Halvard Løver – Machine Engineer Gaute Nisja Holthe-Berg […]
-
Week 3 (07.09-13.09): Automatic watering system for plants
During the past week we have focused on creating a parts and component list for our system as well as trying to get hold of all the necessary parts. After working on this on thursday we managed to get most of the parts we needed. We have also started working on the 3D design of […]
-
Week 1-2 (24.08-06.09): Automatic watering system for plants
We first started by with the assemble of our team which consists of all the different engineering disciplinaries. Since most of our bachelor group have chosen smart systems as a optional course we thought it would be a good idea to work together to get a kick-start on the bachelor project. Our project team consist […]
-
Group 2: Card playing robot – Sprint 2
Sprint 2: 21.08.2020 -28.09.2020 During sprint 2, when the concept was selected, we proceeded to list the system requirements for the card playing in a hierarchical priority order. High: The requirement is absolutely critical for the system, and without it the system wouldn’t perform fully The system should shuffle cards The system should hand out […]
-
Group 2: Card playing robot – Sprint 1
During the first day of the course we began “speed-dating” to form a group for the project. This allowed us to talk to different people across different disciplines and ultimately pair up with students who had the same goal as us. The group consists of: Azim Iqbal – Software engineering Bjørnar Borgersen – Software engineering […]
-
03.09.20
Fredrik og Gustav møttes for å komme ajoure med blogg. Fra sist gang ble det etablert hvilke sensorer som vi trengte og var mulige å finne. For eksempel var det enkelt å finne en lyssensor, mens en nitrat sensor ville koste rundt 65.000 NOK. Det ble derimot etablert at dersom vi ønsket en vektsensor så […]
-
27.08.20
Mål for dagen er å etablere ABC, vi fant med dette ut at med samtale med Steven at vi ikke eksklusivt kunne se på hva som skulle være absolutt krav til minste krav for et vellykket produkt, men vi måtte se på hva som vi måtte ha som krav for å få med alle på […]
-
24.08.20
Gruppemøte for å avgjøre navn og faktisk oppgave. Gruppeleder? I dette møte etablerte vi at vi valgte prosjektet om smart aquarium, med gruppenavn AQUA. Har diskuterte vi også hvilke grunnleggende funksjoner vi ønsket at aquariet skulle ha. Selvvaskende Mating Lys Vannkvalitet (PH, GH, NO2, NO3, temptatur) Målinger Bruke test stripe, dråpetest, grunnet manglende sensor? Lagring […]